'Soft and slumping' Ashburton bridge closed on SH1 after extreme wet weather
Flood-hit Ashburton Bridge on SH1 has now closed and there is currently no alternate route south with other road options also closed.
Ashburton Mayor Neil Brown said the water in the Ashburton River had got into the piles of the bridge, causing a subsidence in the piles.
“The bridge has dropped and you can visually see one section of the bridge is dropped about four to six inches."
Engineers would assess the bridge to see what was required to fix it.
The bridge closure had divided the town into town and cut off part of the South Island. Staff were working hard to open one route by Tuesday night to get south of Ashburton.
Create a Stunning Stain Feature Wall with Resene Colorwood
Transform your living room into a work of art with Resene Colorwood wood stains. Find out how to create your own stain feature wall with these easy step by step instructions.
Poll: Are you starting to feel a lift in business confidence across the Canterbury region?
The Press reports that Canterbury is right in the middle of a construction boom, with activity forecast to peak around 2027 and major investment flowing into transport, water and energy infrastructure.
We want to know: Are you starting to feel a lift in business confidence across the Canterbury region?
-
40.8% Yes
-
59.2% No
Loading…