8 days ago

Zhik Youth wetsuit top Size 12.

Kay from St Heliers

Zhik Youth wetsuit top Size 12.
Used but good condition. From a smoke and pet free home.
The junior’s Anthracite performance range is made to support our upcoming Olympians and World Champions with the most comfortable materials and design on the market. Incorporating cutting edge technology and features taken from our adult Microfleece™ and Superwarm® range, proven to excel; such as 4-way super stretch neoprene and nylon throughout, 3D body mapped fit, fast drying inner fleece, Zhiktex™ II abrasion resistant panels and high stretch stitching. Get the same quality and features loved in our adult suits for the aspiring athlete you know.
FEATURES
1-2MM THERMAL INSULATING NEOPRENE PROVIDES WARMTH FOR EVERYDAY CONDITIONS
4-WAY SUPER STRETCH NEOPRENE & NYLON THROUGHOUT FOR HIGH MANEUVERABILITY
3D BODY MAPPED PANELS FOR THE MOST COMFORTABLE FORM FITTING FIT POSSIBLE
FAST-DRYING INNER FLEECE THAT IS SOFT AND COMFORTABLE
HIGH STRETCH FLATLOCK STITCHING THAT IS STRONG AND NON-ITCH

Price: $40

More messages from your neighbours
1 day ago

Worst Xmas ever?

The Team from Neighbourly.co.nz

There's a a lot of planning that goes into Christmas day and sometimes things just don't go to plan. But it can be a good thing - a family mishap or hilarious memory that you can laugh about in Christmases to come.

Whether you burnt the dinner or were stranded at an airport...

Share your Christmas mishaps below!

Image
5 days ago

Poll: Would you rather: Christmas in summer forever or winter forever?

The Team from Neighbourly.co.nz

Just a bit of a fun poll to get you thinking.

If you had to live out your Christmas days, would you prefer it was a summer Christmas or a winter Christmas?

Image
Would you rather: Christmas in summer forever or winter forever?
  • 61.7% Summer
    61.7% Complete
  • 36.6% Winter
    36.6% Complete
  • 1.7% Other - I'll share below
    1.7% Complete
1251 votes
7 hours ago

Auckland SH1 holiday maintenance

NZ Transport Agency (NZTA)

Prepare for delays at SH1 Spaghetti Junction and the Harbour Bridge from Boxing Day evening until early January. Our crew will be carrying out essential maintenance during this time.

Consider taking the SH16/SH18 Western Ring Route and SH20 if you’re travelling south. Our summer works will continue on SH16 The Strand from January until March.
Find out more

Image