⚠️UPDATE: VICTORIA STREET PIPE BURST⚠️
Good progress has been made to repair a wastewater pipe in Victoria Street in the Wellington CBD, after it burst last night.
The pipe is being excavated and the point of the burst has been found. It is a 300mm, cast iron pipe, that records show was installed in 1961. We are currently planning to replace two six-metre sections of pipe with new, concrete-lined steel, which is a more resilient material. All going well we hope to complete the repair today, with full reinstatement completed tomorrow (Saturday).
Traffic is down to a single lane for a small part of Victoria Street near Harris Street and motorists are being asked to avoid the area if they can, or to expect minor delays.
Normal wastewater flows have been managed by the use of sucker trucks transferring wastewater from the nearby pumping station to a point further along the wastewater network, and by diverting flow into another wastewater pipe in Wakefield Street.
More visual inspections were carried out along the waterfront this morning, with no visible signs of a discharge. Water quality testing will continue, and warning signs remain in place until given the all clear by regional public health.
Poll: Should all neighbours have to contribute to improvements?
An Auckland court has ruled a woman doesn’t have to contribute towards the cost of fixing a driveway she shares with 10 neighbours.
When thinking about fences, driveways or tree felling, for example, do you think all neighbours should have to pay if the improvements directly benefit them?
-
82.1% Yes
-
15.2% No
-
2.7% Other - I'll share below
Cupboards of calm
Transform the inside of your humble storage spaces with Resene paint and you’ll be happy to delve into them in future.
Get our quick tips to transform your storage spaces.