Back
2082 days ago

⚠️UPDATE: VICTORIA STREET PIPE BURST⚠️

The Team from Wellington Water

Good progress has been made to repair a wastewater pipe in Victoria Street in the Wellington CBD, after it burst last night.

The pipe is being excavated and the point of the burst has been found. It is a 300mm, cast iron pipe, that records show was installed in 1961. We are currently planning to replace two six-metre sections of pipe with new, concrete-lined steel, which is a more resilient material. All going well we hope to complete the repair today, with full reinstatement completed tomorrow (Saturday).

Traffic is down to a single lane for a small part of Victoria Street near Harris Street and motorists are being asked to avoid the area if they can, or to expect minor delays.

Normal wastewater flows have been managed by the use of sucker trucks transferring wastewater from the nearby pumping station to a point further along the wastewater network, and by diverting flow into another wastewater pipe in Wakefield Street.

More visual inspections were carried out along the waterfront this morning, with no visible signs of a discharge. Water quality testing will continue, and warning signs remain in place until given the all clear by regional public health.

Image
More messages from your neighbours
21 days ago

Poll: As a customer, what do you think about automation?

The Team from Neighbourly.co.nz

The Press investigates the growing reliance on your unpaid labour.

Automation (or the “unpaid shift”) is often described as efficient ... but it tends to benefit employers more than consumers.

We want to know: What do you think about automation?
Are you for, or against?

Image
As a customer, what do you think about automation?
  • 9.3% For. Self-service is less frustrating and convenient.
    9.3% Complete
  • 43.6% I want to be able to choose.
    43.6% Complete
  • 47.1% Against. I want to deal with people.
    47.1% Complete
2449 votes
25 days ago

Poll: Are you as excited as we are for Te Matapihi’s grand reopening?

The Team from Neighbourly.co.nz

Wellington’s Te Awe Library on Brandon St will be closing its doors for good at 5 pm on March 1. It’s been the city’s largest temporary library, and now it’s making way for the exciting return of Te Matapihi Central Library!

We want to know: Are you as excited as we are for Te Matapihi’s grand reopening?

Want all the details? The Post has everything you need to know.

Image
Are you as excited as we are for Te Matapihi’s grand reopening?
  • 46.3% Yes
    46.3% Complete
  • 53.7% No
    53.7% Complete
309 votes
1 day ago

I'm looking for a workshop in the Wellington Region.

Andrew from Birchville

Does anyone know of any local art workshops on using epoxy resin?
Links or contacts would be greatly appreciated, please
Thanks in advance

Image