SH16 The Strand shared use path
From June to October 2025, we'll be constructing a shared use path (SUP) next to SH16 The Strand to improve pedestrian safety and provide a route separate from the road for cyclists along this heavy freight corridor.
Majority of the work will be carried out during weekdays (7am to 5pm) and traffic will still be able to travel along SH16.
Don't overthink this riddle...
I have a silver sole
but no feet,
I make my living by bringing the heat.
What am I?
Do you think you know the answer? Simply 'Like' this post if you know the answer and the big reveal will be posted in the comments at 2pm on the day!
Want to stop seeing these in your newsfeed?
Head here and hover on the Following button on the top right of the page (and it will show Unfollow) and then click it. If it is giving you the option to Follow, then you've successfully unfollowed the Riddles page.
Wanted a Trelli panel
One of our trellis panels has rotted
So wanting to buy a trellis section 2.1 m long and at least 30 cms high
Contact John 021 966674
Loading…