2132 days ago

Major work ready to start on Mt Albert sludge pipeline repair

The Team from Wellington Water

A temporary speed hump installed in Adelaide Road today signals the start of major repair works on the Mt Albert high-pressure sludge pipelines, following the arrival in Wellington of a team of specialist international technicians and essential materials and equipment.

Wellington Water’s Manager Major Projects, Stephen Wright, says the temporary change is a final part of preparations for repairing the pipes and ending the sludge trucking operations, between Moa Point and the Southern Landfill, that were put in place to avoid any discharge of sludge into the sea after the pipelines failed.

“Bringing the specialist team and materials here from Germany during the global pandemic and our own lockdown has been a real challenge. We’re extremely grateful to the Government for granting the special permission necessary to bring them here so quickly.”

On arrival in the country, the technicians spent 14 days in quarantine in Auckland before travelling on to Wellington, where they arrived last night.

More messages from your neighbours
1 day ago

Poll: If we want to reduce speeding, what do you think actually changes driver behaviour? 🛻🚨🚓

The Team from Neighbourly.co.nz

In the Post's article on speeding penalties, the question is asked whether speeding fines are truly about road safety, or are they just a way to boost revenue for the Crown?

What do you think? Should speeding motorists receive speeding fines or demerit points?

Image
If we want to reduce speeding, what do you think actually changes driver behaviour? 🛻🚨🚓
  • 36.3% The sting of a fine (Money talks!)
    36.3% Complete
  • 63.7% The threat of demerit points (Nobody wants to lose their license!)
    63.7% Complete
399 votes
1 day ago

.

Vincent from Paraparaumu

.

Image
10 hours ago

.

Vincent from Paraparaumu

.

Image