542 days ago

New tram tracks will have to be dug up and re-laid

Nicole Mathewson Reporter from The Press

Part of a multimillion-dollar extension to Christchurch’s tram route is to be ripped up and replaced, just a year after it was built.

The new $3.6 million, 500m loop was only open for six months before it was closed in January when a tram derailed on the Poplar St bend.
Trams have been barred from using the section of track since.

Transport operations manager Stephen Wright said the council had investigated the cause of the derailment and determined it was a result of several factors, including areas where the track levels were “slightly out of tolerance”.
The tracks would be re-laid and upgraded, he said.

The council would not say how much this would cost or how much of the track had to be re-laid, claiming it was commercially sensitive information.

Read the full story from reporter Tina Law here (subscription required - first two articles a month free).

Image
More messages from your neighbours
1 day ago

Best way to use leftovers?

The Team from Neighbourly.co.nz

I'm sure you've got some excess ham at home or cold roast potatoes.

What are some of your favourite ways to use leftover food from Christmas day? Share below.

Image
1 hour ago

Fair play

Resene

Whether it’s a playhouse, she shed or teenager’s sleepout, a stencil-painted floor in Resene Clockwork Orange will elevate it from meh to wow. Find out how to create your own with these easy step by step instructions. Find out more

Image
9 days ago

Poll: Would you rather: Christmas in summer forever or winter forever?

The Team from Neighbourly.co.nz

Just a bit of a fun poll to get you thinking.

If you had to live out your Christmas days, would you prefer it was a summer Christmas or a winter Christmas?

Image
Would you rather: Christmas in summer forever or winter forever?
  • 62.1% Summer
    62.1% Complete
  • 36.4% Winter
    36.4% Complete
  • 1.5% Other - I'll share below
    1.5% Complete
1573 votes