New tram tracks will have to be dug up and re-laid
Part of a multimillion-dollar extension to Christchurch’s tram route is to be ripped up and replaced, just a year after it was built.
The new $3.6 million, 500m loop was only open for six months before it was closed in January when a tram derailed on the Poplar St bend.
Trams have been barred from using the section of track since.
Transport operations manager Stephen Wright said the council had investigated the cause of the derailment and determined it was a result of several factors, including areas where the track levels were “slightly out of tolerance”.
The tracks would be re-laid and upgraded, he said.
The council would not say how much this would cost or how much of the track had to be re-laid, claiming it was commercially sensitive information.
Read the full story from reporter Tina Law here (subscription required - first two articles a month free).
Fair play
Whether it’s a playhouse, she shed or teenager’s sleepout, a stencil-painted floor in Resene Clockwork Orange will elevate it from meh to wow. Find out how to create your own with these easy step by step instructions.
Best way to use leftovers?
I'm sure you've got some excess ham at home or cold roast potatoes.
What are some of your favourite ways to use leftover food from Christmas day? Share below.