Significant traffic delays on Kaipatiki Road from Monday 24 April
Please plan for significant traffic delays on Kaipatiki Road from Monday 24 April.
A massive year-long project will soon begin to upgrade and reroute the wastewater pipes from the Kahika Rd pumpstation, along Kaipatiki Road and up Easton Park Parade. It will then connect to the existing wastewater line to carry sewage through to the Rosedale wastewater treatment plant. The new 2 kilometre-long pipe will increase capacity and help to reduce overflows and discharges into Kaipatiki Creek.
The current pipe that goes over the pipebridge and through Bayview will be decommisioned. Private property connections will be moved from the current pipe to the new pipe.
During construction, parts of Kaipatiki Road will be reduced to 1 lane. Traffic management will be in place 7-days a week, which may be stop/go signs or traffic lights.
Most of Francis Kendall Reserve (between Kaipatiki Rd and Chedworth Drive) is currently closed as the first section of work to be done will be directional underground drilling from the pump station to Francis Kendall Reserve, and then from the reserve back to the northern side of Kaipatiki Rd.
Find out more and sign up to project updates: www.watercare.co.nz... or email: Kahika@water.co.nz
2 x Senior Builders - Small jobs - Maintenance
Mike and I have about 90 years experience between us. There is nothing we can't do around your home. Do you have sticking windows and doors, Aluminium and Timber, catches and handles broken or stuck? Garage Doors included.
Letterboxes a bit wobbly or broken, numbers missing, we still need to find you even if the Postie has gone AWOL.
Kitchen and Bathroom need some maintenance, doors water damaged, hinges not working properly, handles missing or broken. Bench tops tired or want to change the look? Gib installation, plastering and painting. Or a complete remodel.
Weather board replacement or tidying up, painting outside too.
Concrete paths and drive a bit cracked and broken, we can sort these problems also. oil stains an eyesore.
Decks, replace or repair, new stairs and balustrades including railings.
This is only a small list if our expertise, if it needs fixing or changing we have the ability.
Please text or call Mike 02041664786 or Bruce 0212121480 to organise a free visit to discuss your project.
Poll: As a customer, what do you think about automation?
The Press investigates the growing reliance on your unpaid labour.
Automation (or the “unpaid shift”) is often described as efficient ... but it tends to benefit employers more than consumers.
We want to know: What do you think about automation?
Are you for, or against?
-
9.5% For. Self-service is less frustrating and convenient.
-
43.4% I want to be able to choose.
-
47.1% Against. I want to deal with people.
Clown Couture
Don't clown around 🤡 Head on down for some op shopping at the Red Cross Shop Wairau Park!
📍18 Link Drive, Wairau Park
🕐 Mon-Sun: 9.00am to 5.00pm
📞 094409770
Loading…