SH16 The Strand shared use path
From June to October 2025, we'll be constructing a shared use path (SUP) next to SH16 The Strand to improve pedestrian safety and provide a route separate from the road for cyclists along this heavy freight corridor.
Majority of the work will be carried out during weekdays (7am to 5pm) and traffic will still be able to travel along SH16.
CAB Botany Holiday Closure
๐ The offices of our Botany branch will be closed from 4pm on Friday 19 December and we will reopen on Monday 12th January at 9.30am. We wish our clients a relaxing festive holiday and a very happy New Year.
Image credit (altered): Pinterest, Case In Point (CIP) Design, Tauranga, New Zealand
CAB Pakuranga Holiday Closure
๐ The offices of our Pakuranga branch will be closed from 4pm on Monday 22 December and we will reopen on Monday 12th January at 9.30am. We wish our clients a relaxing festive holiday and a very happy New Year.
Image credit (altered): Pinterest, Case In Point (CIP) Design, Tauranga, New Zealand
Poll: ๐๏ธ Would you be keen to switch to a fortnightly rubbish collection, or do you prefer things as they are?
Aucklanders, our weekly rubbish collections are staying after councillors voted to scrap a proposed trial of fortnightly pick-ups.
We want to hear from you: would you be keen to switch to a fortnightly rubbish collection, or do you prefer things as they are?
Keen for the details? Read up about the scrapped collection trial here.
-
83.3% Same!
-
16.7% Would have liked to try something different
Loading…