A big step forward on sorting Onewa Road!
The Kaipātiki Local Board and Auckland Transport is consulting on the removal of all parking on Onewa Road. This will enable the full utilisation of the outside lanes to help move the buses and general traffic. Thankyou to the Auckland Transport staff who have been working hard to progress this on our behalf. This has been a high priority for the Kaipātiki Local Board and the Shore Action team.
➡️ Have your say now: haveyoursay.at.govt.nz...
Consultation closes 6 April. Depending on the outcome of the consultation, work to make these changes could be under way from June!
The main changes in the proposal are:
* Vehicles will no longer be able to park on Onewa Road 24/7.
* Both T3 lanes will remain, with no changes.
* The clearway will become redundant as no parking will be allowed at all.
* The path on the northern side of the road will become a shared path (like on the southern side).
* The P15 carparks on Seaview Ave will be moved from the western side to the eastern side to make it easier for customers of the nearby businesses to park after turning from Onewa Rd.
* The small clearway on Nutsey Ave that has been causing issues will be replaced with yellow lines.
* Signal optimisation will be investigated for the Onewa Rd/Lake Rd/Queen St intersection and Onewa Rd/Birkenhead Ave intersection.
* There will be a trial of removing the bus stop opposite Northcote College, as it has been causing issues with some students running across the road (there is a safer bus stop close to the nearby crossing).
* There will be pedestrian detection system upgrades at the two mid-block pedestrian crossings outside St Mary's School and near Northcote College.
* A ramp to exit the existing shared path will be installed at the top of Onewa Road before the raised path at the corner.
* The middle lane from Birkenhead Ave to Onewa Road (from the town centre) will be marked as both a through and left lane.
* "Keep Clear" road markings will be painted on Birkenhead Ave at the intersection with Hammond Place.
Meanwhile, a project is underway to change the Birkenhead Ave/Onewa Rd intersection to allow the Birkenhead Ave T3 to continue around the corner and connect to the Onewa Rd T3. This project is as-yet unfunded, but is projected to be completed in 2 years time.
* "Keep Clear" road markings will be painted on Birkenhead Ave at the intersection with Hammond Place.
Meanwhile, a project is underway to change the Birkenhead Ave/Onewa Rd intersection to allow the Birkenhead Ave T3 to continue around the corner and connect to the Onewa Rd T3. This project is as-yet unfunded, but is projected to be completed in 2 years time.
A Neighbourly Riddle! Don’t Overthink It… Or Do?😜
Do you think you know the answer? Simply 'Like' this post if you know the answer and the big reveal will be posted in the comments at 2pm on the day!
If you multiply this number by any other number, the answer will always be the same. What number is this?
Poll: As a customer, what do you think about automation?
The Press investigates the growing reliance on your unpaid labour.
Automation (or the “unpaid shift”) is often described as efficient ... but it tends to benefit employers more than consumers.
We want to know: What do you think about automation?
Are you for, or against?
-
9.5% For. Self-service is less frustrating and convenient.
-
43.5% I want to be able to choose.
-
47.1% Against. I want to deal with people.
2 x Senior Builders - Small jobs - Maintenance
Mike and I have about 90 years experience between us. There is nothing we can't do around your home. Do you have sticking windows and doors, Aluminium and Timber, catches and handles broken or stuck? Garage Doors included.
Letterboxes a bit wobbly or broken, numbers missing, we still need to find you even if the Postie has gone AWOL.
Kitchen and Bathroom need some maintenance, doors water damaged, hinges not working properly, handles missing or broken. Bench tops tired or want to change the look? Gib installation, plastering and painting. Or a complete remodel.
Weather board replacement or tidying up, painting outside too.
Concrete paths and drive a bit cracked and broken, we can sort these problems also. oil stains an eyesore.
Decks, replace or repair, new stairs and balustrades including railings.
This is only a small list if our expertise, if it needs fixing or changing we have the ability.
Please text or call Mike 02041664786 or Bruce 0212121480 to organise a free visit to discuss your project.
Loading…