Update on Beach Haven Coastal Connection
Update on Beach Haven Coastal Connection:
Next week the Kaipatiki Local Board will be considering a number of long-awaited exciting projects, including Stage 1 and 2 of the Beach Haven Coastal Connection track upgrade!
STAGE ONE:
Stage 1 is for the upgrade of existing tracks throughout Shepherds Park. It can begin soon after it is approved, and is expected to be completed by March 2022. Stage 1 includes:
* Upgrade of most of the tracks through the bush in the North-Western bush area (shown in light blue and yellow),
* Upgrade of the loop path to an accessible standard (shown in yellow),
* Extension of the concrete path to provide accessible access to the lookout (shown in black),
* Safety upgrade of the lookout area, including a level viewing area and a new fence set back from the cliff-edge (shown in pink),
* Upgrade of the entrance to Hellyers Creek Reserve at the dip in Beach Haven Road (shown in light blue).
STAGE TWO:
Stage 2 is for the upgrade of tracks throughout Hellyers Creek Reserve. It can begin as soon as consent is approved, which is expected to be in March 2022 with completion by June 2023 (final maps still to come). Stage 2 includes:
* Upgrade of tracks to a step-free standard from the lookout in Shepherds Park, through Hellyers Creek Reserve around the coast to Beach Haven Road,
* Realignment of several sections to avoid wet areas and provide step-free access, including a boardwalk near the Lancaster Road entrance.
STAGE THREE:
In 2019 the Local Board consulted on several options for enhancing the Beach Haven Coastal Connection to provide a continuous link from Tui Park through to Witherford Reserve & Eskdale Reserve. Unfortunately due to COVID-19-related budget cuts, the funding that we had tagged to the project was pushed out until at least 2024/25 and is now referred to as Stage 3.
Below are the results of the consultation, however this may need to be repeated when the funding becomes available again:
* 28% - Do Nothing (option 1)
* 72% - Proceed with Option 2, 3, 4a or 4b.
Of the 72% who chose to proceed, the options were ranked as follows:
* 53% - Option 4b: Glulam bridge from behind Paragon Ave to near Lancaster Rd, and boardwalk from behind O'Donn Ave to Kahika Reserve.
* 50% - Option 2: Boardwalk between Shepherds Park and Tui Park.
* 42% - Option 3: Boardwalk between Shepherds Park and Tui Park, with a spur to Tui Park Beach.
* 35% - Option 4a: Suspension bridge between Shepherds Park near the football club to behind Paragon Avenue.
NOTE that the football club to Paragon Ave portion of Option 4a, and the Paragon Ave to Lancaster Rd portion of option 4b, are now redundant because alternative designs for these portions are being incorporated into Stage 2 of the track upgrades.
What's your favourite recipe for courgettes?
Kia ora neighbours. If you've got a family recipe for courgettes, we'd love to see it and maybe publish it in our magazine. Send your recipe to mailbox@nzgardener.co.nz, and if we use it in the mag, you will receive a free copy of our January 2025 issue.
Poll: Do you think banning gang patches is reasonable?
With the government cracking down on gangs, it is now illegal for gang members to display their insignia in public places whether through clothing or their property.
This means arrests can be made if these patches are worn in places like restaurants, shops, on public transport or ferries, and on airplanes. Arrests were made recently at a funeral.
Do you think this ban is reasonable?
-
77.2% Yes
-
21.2% No
-
1.5% Other - I'll share below
Bokashi bucket composting workshop @ Glenfield Library
Don't miss Glenfield Library's Bokashi bucket composting workshop tomorrow, 2:00 - 3:30 PM. Make your own DIY Bokashi bucket to take home or surprise a loved one with a unique Christmas gift.
All participants get a discount voucher to use towards a composting system.
Register for the workshop via bit.ly...
This course is proudly supported by Auckland Council and delivered by the Compost Collective.