MOA POINT SLUDGE UPDATE
The trucking operations that have been operating this week, continue to prevent sludge from being discharged into the Cook Strait. The alternative operation means trucks on 24 hour rotation collect the wastewater treatment byproduct at the Moa Point Treatment Plant, taking it to the landfill at Carey’s Gully.
The operation was today refined by reducing the amount of trucks on the road and splitting them into two shifts of 6-7 trucks each. These trucks are continuing to keep up with demand, and are operating efficiently.
The fault in the pipeline was located yesterday, and we are continuing to plan a repair with a temporary bypass, as well as a long term fix. The location appears to be about 200m inside the tunnel under Mt Albert.
We are working with the local community at Moa Point, and are holding a community meeting on Sunday to update them on the project and address any concerns residents may have.
We will provide further update on Monday 27 January.
Poll: Should all neighbours have to contribute to improvements?
An Auckland court has ruled a woman doesn’t have to contribute towards the cost of fixing a driveway she shares with 10 neighbours.
When thinking about fences, driveways or tree felling, for example, do you think all neighbours should have to pay if the improvements directly benefit them?
-
82.1% Yes
-
15.2% No
-
2.7% Other - I'll share below
Cupboards of calm
Transform the inside of your humble storage spaces with Resene paint and you’ll be happy to delve into them in future.
Get our quick tips to transform your storage spaces.