Newlands, Wellington

Got some bits to give away?

Got some bits to give away?

Clear our that garage and pop it on Neighbourly Market for free.

1939 days ago

Pet carrier tote bag

Chelsea from Grenada Village

Brand new never used. Pick up Grenada Village or Wellington station.

Price: $10

1939 days ago

Red winter women’s peacoat size 12

Chelsea from Grenada Village

Beautiful red winter peacoat size 12. Has zipper and hood. Love it but is too small for me. Excellent condition. Pick up Grenada Village or Wellington station.

Price: $39

T
1939 days ago

Boys clothes free

Tatiana from Paparangi

Hi, I have got a big box of clothes that are too small for my boy now. Anyone wants them? They are all size 2 and 3. Some shoes too. Only have a photo of the top of the box.
Puck up from paparangi

Free

Image
A
1940 days ago

Breville Cafe Roma...

Ann from Paparangi

$50 ono
Built in
Milk steamer

Comes with
1 x single measure
1 x double measure
Tamper/spoon/measure… View more
$50 ono
Built in
Milk steamer

Comes with
1 x single measure
1 x double measure
Tamper/spoon/measure
Milk jug

Great condition
Selling to fundraise for daughters school French trip 2020

Pick up Paparangi

PM for more information

Negotiable

Image
K
1940 days ago

Gas Flued LPG Heater

Karolyn from Khandallah

Gas flued heater Realfire RF700 www.realfires.co.nz...

- runs on LPG, needs to be installed and hard wired in. Includes wooden surround and concrete hearthAbout 15 years old, runs well. Make an offer!

Negotiable

K
1940 days ago

Post renovations free fence

Karolyn from Khandallah

Wooden fence with hinges

Free

Image
1941 days ago

Omāroro Reservoir Pipelines Project in Mt Cook

Daniel Melbye from Wellington City Council

Wellington Water continues to work on the Omāroro Reservoir Pipelines Project in Mt Cook, installing pipelines to connect the planned Prince of Wales reservoir to the city network and making our water supply more resilient to disaster and disruption.

The Pipelines Project is set for completion in… View more
Wellington Water continues to work on the Omāroro Reservoir Pipelines Project in Mt Cook, installing pipelines to connect the planned Prince of Wales reservoir to the city network and making our water supply more resilient to disaster and disruption.

The Pipelines Project is set for completion in mid-2020 and will affect traffic in the area as new pipelines are installed down Hargreaves Street and then into Wallace Street which is a major arterial road.

While every effort is being made to reduce impact on commuter traffic and disruption, this will cause delays and disruptions, but this is sometimes unavoidable due to the location of the pipes and for health and safety reasons.

Traffic information will be well sign posted. Please take care and follow directions, or use alternative routes avoiding the Mt Cook area.

We are working closely with residents in the area, and pedestrian access won’t be affected.

Apologies for any inconvenience, and thank you for your cooperation in improving the city’s water infrastructure.

For more information:
www.wellingtonwater.co.nz...
twitter.com...

1941 days ago

Office Chair

Anna from Ngaio

Perfect condition just no longer needed!!! Message me if you want it 😊😊

Free

L
1941 days ago

NO PLAYGROUP at CASHMERE HOME TODAY

Liz from Paparangi

We'll see you next week instead! :)

Image
1945 days ago

Looking for a set of sink taps

Hayden from Johnsonville

We are looking for a replacement set of taps which will fit over our 20mm diameter threaded pipe outlets. They don't need to be the same but need to fit over our pipe or have the same internal mechanism.

Image
Top