DIXON ST
As part of the urgent works on Dixon St we’ve had a drill rig onsite, drilling to install posts which will help shape the chamber required to make repairs to the wastewater pipe and tunnel.
This afternoon while drilling and pumping concrete to create one of the posts, part of the tunnel wall collapsed into the existing void, creating a larger hole.
There was a small overflow of wastewater onto the street, which has been cleaned up, and crews are working to ensure wastewater is diverted from the area to reduce the risk of further overflows into the stormwater network and the harbour.
Sucker trucks are also being deployed to transport wastewater away from this part of the network. This will extend the amount of time we’ll have to install a temporary bypass, expected to be in place by early morning.
🧩😏 Riddle me this, Neighbours…
I am an odd number. Take away a letter and I become even. What number am I?
Do you think you know the answer?
Want to stop seeing these in your newsfeed? No worries! Simply head here and click once on the Following button.
Addictive Eaters Anonymous
How much does it cost to join AEA?
There are no dues or fees for joining AEA or attending AEA meetings. We are self-supporting through our own voluntary contributions. At some point during each meeting we pass the basket to help cover expenses, such as the cost of rent and literature. Members are not obliged to contribute, but we usually do so to the extent we are able.
Share your favourite main crop potato recipe and win a copy of our mag!
Love potatoes? We will give away free copies of the May 2026 issue to readers whose potato recipes are used in our magazine. To be in the running, make sure you email your family's favourite way to enjoy potatoes: mailbox@nzgardener.co.nz, by March 1, 2026.
Loading…