Wellington to Hutt pathway to be fast tracked
It has taken more than 100 years but the long talked about shared pathway between Wellington and Hutt Valley is about to begin.
The Government has fast tracked construction of the $130 million harbour side path and construction could get underway as soon as next year.
The new Ngāūranga to Petone section will be a shared path with a 5m wide sealed surface, on the harbour side of the Hutt Valley Railway Line, according the new designs, released today by Waka Kotahi NZ Transport Agency.
It will provide a continuous connection between the existing Wellington to Ngāūranga section, which is scheduled for upgrades, and the new Petone to Melling section, which is currently under construction.
A 1.8 metre chain link fence will separate the path from the adjacent railway line.
.
Tawa Lions Market during Holidays
There will be no Tawa Lions Stall operating on 27th Dec and 3rd Jan
Van Bui will be there as normal selling fruit and veges.
Market at Outlet City Car Park, near Dominos Pizza, Main Road Sth, Tawa. 9am to 2pm
tawamarket@lionsclubs.org.nz
Create a Stunning Stain Feature Wall with Resene Colorwood
Transform your living room into a work of art with Resene Colorwood wood stains. Find out how to create your own stain feature wall with these easy step by step instructions.
Loading…