Wellington to Hutt pathway to be fast tracked
It has taken more than 100 years but the long talked about shared pathway between Wellington and Hutt Valley is about to begin.
The Government has fast tracked construction of the $130 million harbour side path and construction could get underway as soon as next year.
The new Ngāūranga to Petone section will be a shared path with a 5m wide sealed surface, on the harbour side of the Hutt Valley Railway Line, according the new designs, released today by Waka Kotahi NZ Transport Agency.
It will provide a continuous connection between the existing Wellington to Ngāūranga section, which is scheduled for upgrades, and the new Petone to Melling section, which is currently under construction.
A 1.8 metre chain link fence will separate the path from the adjacent railway line.
.
Poll: Should all neighbours have to contribute to improvements?
An Auckland court has ruled a woman doesn’t have to contribute towards the cost of fixing a driveway she shares with 10 neighbours.
When thinking about fences, driveways or tree felling, for example, do you think all neighbours should have to pay if the improvements directly benefit them?
-
82.1% Yes
-
15.2% No
-
2.7% Other - I'll share below
Moe mai rā, Nicholas.
We're sad to announce the passing of Nicholas Boyack, our Hutt Valley reporter who has long written for The Dominion Post, The Hutt News and Upper Hutt Leader.
What's your favourite recipe for courgettes?
Kia ora neighbours. If you've got a family recipe for courgettes, we'd love to see it and maybe publish it in our magazine. Send your recipe to mailbox@nzgardener.co.nz, and if we use it in the mag, you will receive a free copy of our January 2025 issue.