Be prepared for upcoming roadworks
SH1 Transmission Gully works until mid-February, weather permitting.
There’s no roadworks for the holiday break from Friday 19 December, and all lanes will be fully open. Contractors are back to work on Monday 5 January, at night. Plan ahead for lane closures, night-time road closures and speed restrictions until mid-February. When the highway is closed, detours are via State Highway 59 and State Highway 58.
Chip-seal works begin in early January, so drivers must do 30km/h to prevent flying chip that can damage vehicles.
Some Choice News!
Many New Zealand gardens aren’t seeing as many monarch butterflies fluttering around their swan plants and flower beds these days — the hungry Asian paper wasp has been taking its toll.
Thanks to people like Alan Baldick, who’s made it his mission to protect the monarch, his neighbours still get to enjoy these beautiful butterflies in their own backyards.
Thinking about planting something to invite more butterflies, bees, and birds into your garden?
Thanks for your mahi, Alan! We hope this brings a smile!
Poll: Are our Kiwi summer holidays helping us recharge, or holding the economy back? ☀️🥝
There’s growing debate about whether New Zealand’s extended Christmas break (and the slowdown that comes with it) affects productivity.
Tracy Watkins has weighed in ... now it’s your turn. What’s your take? 🤔
-
73.2% We work hard, we deserve a break!
-
15.7% Hmm, maybe?
-
11.1% Yes!
Loading…