Amazing Large Hand-Built Dolls House
This would be a wonderful Xmas present!
Hand-built dolls house – this came from a craft-fair type shop in Porirua about 20 years ago.
The furniture is selling with the house – including two good-quality 1/12-scale doll figures.
While there is still some dust to clean off, the house is generally in good condition.
This is a unique work of art! Very unusual to see one like this for sale!
Dimensions: 850mm wide, 440mm deep and 940mm high (including the chimney).
It is mounted on a fixed base, which measures 850mm wide by 670mm deep – this includes the paving in front of the house. Very solidly built, and therefore, rather heavy!
There is a hatch in the back of the roof, giving access to the attic hide-away.
Inspection welcome – pickup is from our house in Tawa.
Poll: Are you as excited as we are for Te Matapihi’s grand reopening?
Wellington’s Te Awe Library on Brandon St will be closing its doors for good at 5 pm on March 1. It’s been the city’s largest temporary library, and now it’s making way for the exciting return of Te Matapihi Central Library!
We want to know: Are you as excited as we are for Te Matapihi’s grand reopening?
Want all the details? The Post has everything you need to know.
-
46% Yes
-
54% No
Poll: As a customer, what do you think about automation?
The Press investigates the growing reliance on your unpaid labour.
Automation (or the “unpaid shift”) is often described as efficient ... but it tends to benefit employers more than consumers.
We want to know: What do you think about automation?
Are you for, or against?
-
9.2% For. Self-service is less frustrating and convenient.
-
43.7% I want to be able to choose.
-
47.1% Against. I want to deal with people.
Heads up – upcoming gas network works
Copied from the Tawa Business Group Incorporated Facebook page: Powerco Limited, which owns and operates the natural gas network in our area, will be carrying out essential upgrade works along Main Road, Tawa, over the coming weeks as part of their ongoing improvement programme.
🔧 What’s happening? Powerco’s Tier 1 contractor, Downer New Zealand – Energy, will be building a new District Regulator Station (DRS) to replace an older, less efficient station. This will also involve installing new gas mains to connect the new station into the local gas network.
📅 Timing
Exploratory works begin: from 9 February 2026
Main works period: 9 February – 31 March 2026
Road impacts to note:
o From 23–28 February, there will be partial and full road closures (to be confirmed closer to the time).
o During partial closures, there will be no entry into Redwood Ave from Main Road (exit only).
🚦 Traffic & access
Temporary traffic management will be in place at various times. Some areas will be fenced off for safety, and trenches will be bridged with composite vehicle plates. Access for residents and businesses will be maintained throughout the works.
🗺️ Where will work happen? The yellow lines on the map show the areas where trenches will be dug for the new gas mains.
Thanks for your patience while this important infrastructure upgrade is carried out – we’ll share more details as they’re confirmed.
Loading…