November rainfall maps
Posted by Northland Regional Council
🌧️ November rainfall maps
November was WET. Another damp and muggy month.
🌡️ Daily maximum temperatures were relatively constant, with daily highs most days sitting in the low to mid 20s and a few days going to 25 degrees. In central Whangārei, temperatures never went below 10 degrees.
⬆️ The highest monthly total was at Hātea Glenbervie Forest HQ, where 425mm was recorded.
⬇️ On the low side, 107mm was recorded at Kai Iwi Lakes.
November in Northland usually produces an expected rainfall of around 78mm. With the average accumulated total being 241mm, this is 314% of what we would expect! (over 3 times the expected November rain)
Rainfall maps can be found here: www.nrc.govt.nz...
Worst Xmas ever?
There's a a lot of planning that goes into Christmas day and sometimes things just don't go to plan. But it can be a good thing - a family mishap or hilarious memory that you can laugh about in Christmases to come.
Whether you burnt the dinner or were stranded at an airport...
Share your Christmas mishaps below!
NO SANDMINING BREAM BAY/RUAKAKA - Please Sign Petition
The locals and community are summarizing all the feedback.
They are currently summarizing the ideas and then we will organize strategic actions etc.
In the meantime,
1. Keep inviting people to the page
2. Encourage signatures (online petition)
3. Print the updated sign and ask shops businesses / work / clubs etc to display.
TIME IS OF THE ESSENCE
#ruakaka #waipu #Takhiwai #langsbeach #whangarei #Onertreepoint #whangareiheads #reotahi #paruabay #mcleodbeach #onerahi #tamaterau #uretiti
www.endangeredspecies.org.nz...
No Sandmining Bream Bay/Ruakākā
Help protect our precious coastlines by signing the petition to stop destructive sand mining in Bream Bay, which includes Waipu Cove, Langs Beach and Ruakākā.
Sand mining destroys sea floors, erodes coastal protections, and threatens the habitats of critically endangered species like the tara iti - our most endangered bird with less that 40 left.
Why is this so urgent?
McCallum Bros Ltd (MBL), an Auckland-based mining company, is planning to extract 9 million cubic meters of sand from the seabed in Bream Bay over the next 35 years. Their proposal includes dredging up to five nights a week, for six hours at a time, with all the sand being sold to Auckland's construction industry.
This operation is expected to generate $270 million in revenue, or approximately $7.7 million annually, for MBL. Meanwhile, Bream Bay will see no benefits—only lasting harm. The dredging will cause irreversible damage to marine life, fish populations, and surf breaks, devastating the local ecosystem.
MBL is seeking consent for this project through the fast-track process, which excludes public consultation. This means we have no say in whether they can take our sand, destroy marine habitats, and damage our seabed.
The proposal will be presented to the government in mid-January 2025. We are at a critical moment.
Take action now — sign and share this petition to protect Bream Bay.
www.endangeredspecies.org.nz...