770 days ago

New traffic management in place on Seaview Road

Wellington Water from Wellington Water

As part of the Barber Grove wastewater pipe renewal works, Wellington Water is constructing a new trench on Seaview Road.

As a result, there will be new traffic management in place, from Monday, November 21.

The road will be reduced to one lane on each side from 8 Seaview Road through to the Petone Z Petrol Station just before the Seaview roundabout.

Please follow all onsite signage and take care with merging.

The existing bus stop will be temporarily relocated to the south of the site. Cyclists and pedestrians will be escorted through site. There is no change to the Urupa carpark access.

Traffic management will be in place until late March 2023.

The hours of work will generally be 7am – 6:30pm Monday to Friday, with some Saturday work as required

More messages from your neighbours
2 minutes ago

Fair play

Resene

Whether it’s a playhouse, she shed or teenager’s sleepout, a stencil-painted floor in Resene Clockwork Orange will elevate it from meh to wow. Find out how to create your own with these easy step by step instructions. Find out more

Image
9 days ago

Poll: Would you rather: Christmas in summer forever or winter forever?

The Team from Neighbourly.co.nz

Just a bit of a fun poll to get you thinking.

If you had to live out your Christmas days, would you prefer it was a summer Christmas or a winter Christmas?

Image
Would you rather: Christmas in summer forever or winter forever?
  • 62.1% Summer
    62.1% Complete
  • 36.4% Winter
    36.4% Complete
  • 1.5% Other - I'll share below
    1.5% Complete
1573 votes
1 day ago

Best way to use leftovers?

The Team from Neighbourly.co.nz

I'm sure you've got some excess ham at home or cold roast potatoes.

What are some of your favourite ways to use leftover food from Christmas day? Share below.

Image