Returning kiwi icon is MotoFest draw-card
Mike Pero MotoFest 2019 will be the homecoming for Taihape-born Kiwi international Simon Crafar. Crafer will the headline act at the second annual Mike Pero MotoFest extravaganza at Hampton Downs over the weekend of March 2-3.
The jam-packed weekend will be a unique Kiwi festival of motorcycling, with speed, power, poise, balance, daring and high-octane expression by the bucket-load.
MotoFest will run with the same format that was introduced last time around and will again include the popular Kawasaki Trail Ride, Motul Trials Challenge, Star Insurance Bike Show, Alpine Stars Dinner event, Shoei Classic, as well as the national championship superbike racing.
For the first time, ACC’s Shiny Side Up Bike Fest will also be running in conjunction with MotoFest.
🧩😏 Riddle me this, Neighbours…
I am an odd number. Take away a letter and I become even. What number am I?
Do you think you know the answer?
Want to stop seeing these in your newsfeed? No worries! Simply head here and click once on the Following button.
Scam Alert: Bank cold calls
ASB is warning customers about reports of cold calls from scammers claiming to be from ASB. These scammers are trying to obtain personal information, including usernames, dates of birth, and verification codes sent to your mobile phone.
🛡️ The "Caller Check" Test
If you get a call from someone claiming to be from ASB and you’re unsure, just ask them for a Caller Check. You will then be able to verify the call through the app.
Remember, banks will:
❌ Never ask for your banking passwords, PINs, or verification codes
❌ Never need to know your full credit card number – especially the CVC
❌ Never ask you to download software or remotely access your device
❌ Never ask you to purchase gift cards or transfer funds.
If you have received a phone call and think your account has been compromised, call ASB on 0800 ASB FRAUD (0800 272 372), or visit your local branch.
Will these roadworks affect you?
Don’t expect a quick trip between Cambridge and Tamahere for much of this year, because major roadworks are starting.
Asphalt works on that section of Waikato Expressway will run from March through to late 2026, NZ Transport Agency Waka Kotahi (NZTA) says. Motorists are warned to plan for significant delays.
“Unfortunately the pavement, particularly in the slow lanes, has deteriorated faster than expected,” NZTA’s Roger Brady said.
Will these roadworks affect you? Tell us more in the comments (adding NFP if you don't want your words used in print).
Loading…