Western Lake, Featherston

Ryman’s Walk in Wednesdays

Ryman’s Walk in Wednesdays

Ryman villages across the country are open every Wednesday in November.

1721 days ago

What does declaring a pandemic for Covid-19 mean?

The Team Reporter from Stuff

Hi neighbours,

The coronavirus "outbreak" has been officially declared a pandemic by the World Health Organisation – but what does that mean?

To read more, click here.

Image
E
1720 days ago

Garage sale

Elaine from Maymorn

Garage sale 3 Paton st, Maymorn. 9 am. Saturday March 14. 2 households combined. Plants, nic nacks, books, small furniture, clothing etc etc

1720 days ago

Borage

Debbie from Greytown

1 borage plant $3

Price: $3

Image
1720 days ago

⚠POWER OUTAGE UPDATE - SOUTH WAIRARAPA⚠

The Team from Wellington Water

During this morning’s power cut we were able still to deliver drinking water across the Wellington region and South Wairarapa. Reservoirs were able to manage the demand, and storage is recovering in reservoirs now that treatment plants are operational.

For Featherston and Greytown residents, as … View more
During this morning’s power cut we were able still to deliver drinking water across the Wellington region and South Wairarapa. Reservoirs were able to manage the demand, and storage is recovering in reservoirs now that treatment plants are operational.

For Featherston and Greytown residents, as the reservoir that supplies your area is taking longer to recover, we would appreciate it if you could reduce your water consumption where you can. We’ll share another update when you can use water normally again. Thank you for your patience.

1721 days ago

⚠POWER OUTAGE UPDATE 11.45AM⚠

The Team from Wellington Water

Thanks again for your patience as we worked through this power outage. We can confirm everything is up and running as it should be, and all residents in the Wellington region and South Wairarapa can continue with their regular water use.

Crews will continue to investigate the network throughout … View more
Thanks again for your patience as we worked through this power outage. We can confirm everything is up and running as it should be, and all residents in the Wellington region and South Wairarapa can continue with their regular water use.

Crews will continue to investigate the network throughout the day.

1721 days ago

⚠ POWER OUTAGE UPDATE 10.30AM ⚠

The Team from Wellington Water

Power has been restored to the region, and the majority of the pumping stations and all treatment plants are back online. We are investigating the wider network to ensure everything is operating as normal.

We continue to ask the wider Wellington region to be mindful of their water consumption, and… View more
Power has been restored to the region, and the majority of the pumping stations and all treatment plants are back online. We are investigating the wider network to ensure everything is operating as normal.

We continue to ask the wider Wellington region to be mindful of their water consumption, and ask South Wairarapa residents to continue to reduce their water consumption and avoid flushing their toilets. Reducing demand allows the assets to operate without added pressure when they come back online.

All of the critical assets including pumping stations and treatment plants have generators in operation as part of our resilience plan. We also have mobile generators available for other pumping stations.

1721 days ago

Open Days: 20 and 22 March

Queen Margaret College

Would your daughter enjoy being at a school where sustainability, school spirit, and sisterhood thrive?

Do you want to give your daughter every chance of reaching her potential, and taking her place in the world?

We offer an environment that encourages initiative, grows confidence and … View more
Would your daughter enjoy being at a school where sustainability, school spirit, and sisterhood thrive?

Do you want to give your daughter every chance of reaching her potential, and taking her place in the world?

We offer an environment that encourages initiative, grows confidence and nurtures passions for learning.

Girls. Year 1-13. Boarding options available. Co-ed pre-school.

CBD location. Close to public transport.

Friday 20 March
School in Action
9am to 12.30pm
You and your daughter can walk through our classrooms and be part of different activities.

Sunday 22 March
Open Day
10am to 1pm
Perfect for the whole family.

We invite you to visit our school.
53 Hobson Street, Thorndon

Go to our website to register your interest.
Find out more

Image
1722 days ago

Street Party this Friday in the Greytown Hub

Local Greytown eateries are teaming up to host a street party this Friday 6pm – 9pm at the Greytown Hub. It's a welcome to the Wairarapa Wines Harvest Festival event on this weekend.
Tasty dishes will be available from a range of local nearby restaurants including Saluté. There'll … View more
Local Greytown eateries are teaming up to host a street party this Friday 6pm – 9pm at the Greytown Hub. It's a welcome to the Wairarapa Wines Harvest Festival event on this weekend.
Tasty dishes will be available from a range of local nearby restaurants including Saluté. There'll also be wines available by the glass from Gladstone Vineyard, live blues music and some local shops open till late.

Image
1722 days ago

Spoilt for choice this weekend!

Pixie from

Soooo much on this weekend with several events over the Wairarapa region.
Dance your heart out at the 121 concert tauherenikau racecourse.
Enjoy a fun family day out at the Castlepoint Beach Races.
Join the crowd to watch the Bush Cycle tour at Tui Brewery Mangatainoka.
Pop in and see the great … View more
Soooo much on this weekend with several events over the Wairarapa region.
Dance your heart out at the 121 concert tauherenikau racecourse.
Enjoy a fun family day out at the Castlepoint Beach Races.
Join the crowd to watch the Bush Cycle tour at Tui Brewery Mangatainoka.
Pop in and see the great exhibitions at Aratoi or enjoy and afternoon at Masterton Park with the kids.

Don't forget those local Farmers Markets too!
Visit our web site www.wairarapanz.com... for more information.

Psst - Coming up next Saturday 21st March -Around the vines Martinborough so get your running shoes and costume ready to run or walk 10km or 21km through the vineyards and country roads with a chance to sample local wines too!

1722 days ago

Willis Street works nearing connection stage

The Team from Wellington Water

The first stage of the work to connect a new wastewater pipe in Willis Street, replacing the temporary overland pipe installed after the original tunnel collapse in December, is expected to be complete by the end of March.

Wellington Water Group Manager Tonia Haskell says the final stage of pipe … View more
The first stage of the work to connect a new wastewater pipe in Willis Street, replacing the temporary overland pipe installed after the original tunnel collapse in December, is expected to be complete by the end of March.

Wellington Water Group Manager Tonia Haskell says the final stage of pipe laying along Willis Street is being completed using trenchless methods to lay the pipe underground and below existing services at the Ghuznee Street end.

“This means we’re now approaching one of the last and most complex parts of the job, to connect the new permanent underground pipe to the network and decommission the overland pipe along Willis Street.

“To achieve this we will need to shut down the wastewater pumping stations close to the harbour that send flows up to and along the overland pipe. We’ve been doing a lot of planning for this as it is risky and at all costs, we want to avoid spilling any wastewater into the harbour.

“We need low tide, dry weather, low wastewater flows and ensuring that all existing city wastewater storage is empty so it can take the flow. We also have contingency planning in place including sucker trucks, and ensuring the old interceptor is clear to support management of the wastewater flows.”

Ms Haskell says all this is expected to take place in the week of 23 March pending having optimal conditions.

“If we get heavy rain for example, we wouldn’t be able to turn off the pump stations to disconnect the overland pipe due to the risk of overflowing in the harbour. So in that instance the work would be delayed.”

This phase of the work is expected to take between 6-8 hours, however, it will require Dixon Street between Willis and Victoria Street to be closed to through traffic for up to three days. This is to allow the underground pipe to be exposed, the connection to be made, and then the road to be reinstated. One lane of Willis Street will be opened for for local traffic, travelling one-way from Ghuznee Street entrance.

The pipe ramp will still be in place so the road cannot be used as a main thoroughfare and there will still be no parking along the section of Willis Street between Ghuznee and Dixon streets. Traffic controllers will be onsite to assist throughout.

“Once the permanent pipe is connected, we can remove the overland pipe and bring in contractors to reseal the road. We are talking with Wellington City Council now about reinstatement of the road, which we’d expect to take one to two days. The focus will then shift from Willis Street to laying new pipe in the adjoining slipway down the motorway. This is expected to be complete mid-year but will have minimal traffic impacts.”

Meanwhile, investigative drilling work is being done to determine the best approach to sealing the tunnel at the separate Dixon Street site.

“Work to drill the final boreholes will continue this week and once that is completed, we’ll be able to do a thorough geotechnical assessment of the ground conditions to allow us to complete design work.”

Image
Top