Is the project too big?
In 2019, the Ministry of Education announced the co-location project for the Marlborough boys and girls colleges at the 13.2-hectare McLauchlan St site, currently occupied by the girls college and Bohally Intermediate.
The building company to deliver the long-awaited co-located colleges project has been appointed, but the time-frame and final costs are yet to be nailed down. The master planning phase will determine how the project will unfold, including how the schools will function during the multi-year construction. Do you think the process will take too long, and will the colleges be able to maintain their individual identities?
Poll: Would you use a Picton-Blenheim Saturday bus?
The Marlborough District Council plans to trial a Saturday bus between Picton and Blenheim, in response to feedback from Picton residents wanting to visit the new Blenheim library. It would leave Waikawa Bay at 9am and 1pm, and Blenheim's Seymour St at 10.10am and 2pm.
-
43.5% Yes
-
39.1% No
-
17.4% Maybe
Potted colour
Express yourself with this artistic dip-dye paint effect using Resene paints. Find out how to create your own with these easy step by step instructions.
Beach trolley
Hi. Anyone around is selling a beach trolley with possible canopy? Due to budget, will work on getting just a 2nd hand. Would need one to put all kids stuff before anzac holiday😊. Thank you.